DOWNLOADS

  • These links allow you to download information on Safe Working in Close Proximity to High Pressure Pipelines. These files are available in Adobe Acrobat 'pdf' format, and as Zipped Acrobat files.
  • Image

    Special Requirement for Safe Working Download

    Updated: Apr 2013

    For pipelines owned and or operated by: BPA, Centrica Energy, ConocoPhillips, E-ON, Esso Petroleum Company Ltd, Goverment Pipelines & Storage System, Ineos, Mainline Pipelines Ltd., Manchester Jetline Ltd., Marchwood Power, Sabic, Shell, Star Enegy, Total, Wingas.

    File size: 680KB

  • Image

    Pipeline Markers Download

    Updated: Apr 2013

    Typical Pipeline Markers -
    Awareness and preparation is the key to safe excavation.

    File size: 488KB

  • Image

    Safe Digging ToolboxDownload

    Updated: Apr 2013

    Save Digging -

    Avoid Personal injury or death / Avoid environmental damage / Avoid financial penalties / Avoid prosecution / Avoid delays

    File size: 1.71MB

  • Image

    Land owners 2012Download

    Updated: Aug 2012

    Landowner brief - guidance for safe working near high pressure pipelines.

    File size: 287KB

  • Image

    2011 Infringement Report Download

    Updated: 2012

    A new version of the 2011 Infringement report are now available as .pdf downloads.

    File size: 434KB

  • Image
    • May
    • 23
    Avon OSH Group - Bristol (KB)
    Arranged by: Linewatch
    Involving:
    All
    • Jun
    • 04
    DalcourtMaclaren - Weston (PH)
    Arranged by: Linewatch
    Involving:
    All
    • Jul
    • 04
    SSE Contracting - Leeds (PH)
    Arranged by: Linewatch
    Involving:
    All
  • Click here for more Presentation EventsImage

Linewatch, FisherGerman LLP. ©2013 All Rights Reserved.

WEB DESIGN AND CONTENT MANAGEMENT BY ENTAMEDIA INTERACTIVE